The Venator- ''First in Last Out'' Long Range Recon Patrol

Forgeworld elysian venator with LRRP Trailer fitted Built over 5 days, trailer uses chassis from a second kit,with full equipment load for long range patrols great fun to build, will be doing another one!! scheme for dessert/tundra operations

Posted: 30 Oct 2011

Favourite
6.6 /10 (30 Votes) 1.4k Views

Be the first to comment!

More by Tinman397

Back To Top