The carpenter is sorting the kitchen, but he\'s got some personal matters. Got to get a new one in I think. The area covers 3 separate rooms or spaces, being the kitchen itself, a dining area and the middle room as a crashing out place with sofas. It\'s a £25k project, with a new pitched roof replacing the flat one, and a complete overhaul. There\'ll be wood flooring in 2 parts, travertine in the kitchen through utility...and the kitchen is Homebase and will need constructing on site by the poor carpenter lol A lot of kitchen to be fair.
internally, a supporting wall was pushed back a few feet, so that in itself was pretty big. A lot of plastering has been done, as have all the groundworks for the electrics and plumbing. Just waiting to do the kitchen so the floor can follow. Throw in new French doors, a new back door, new internal doors...............
Dear god, it goes on. It\'s actually been very smooth till now!